Location

Hove

Project Status

In Progress

Project Type

Extension

Scope of Work
Complex extension project in Hove, delivered in partnership with RBPM, involving structural alterations beneath the existing first floor and new extension works.

Key Tasks
Foundations: Excavation and foundation works completed to support the new extension.
Steel Installation: Structural steels currently being fitted in preparation for the knock-through.
Knock-Through Works: Ground floor demolished while carefully retaining the first floor above.
Beam & Block Flooring: Next phase will see installation of beam and block flooring up to DPC level.
Build-Up Works: Structure to be built up to second floor once the base and steels are in place.

Benefits
• Maximises living space through a carefully engineered extension.
• Maintains existing structure while integrating new build elements.
• Strong collaboration with RBPM ensuring smooth delivery of complex works.
• Long-term durability with modern construction methods.