Woodingdean Double-Storey Extension

Location

Woodingdean

Project Status

In Progress

Project Type

Extension

Scope of Work
Double-storey rear extension including full substructure and superstructure works, with preparations in place for loft conversion integration.

Key Tasks
Substructure and Superstructure: Full groundworks and structural build underway, forming the base of the new rear extension.
Undercroft Construction: Built up to joist level, establishing the groundwork for the floors above.
Next Phase: Ground floor walls will be built up to first floor level, with the gable to follow for the planned loft conversion.

Benefits
• Significant increase in internal space over two levels.
• Structural layout designed to accommodate a future loft conversion.
• Robust substructure ensures long-term stability and durability.

This extension is taking shape, with the next phase set to bring the full structure into view.